Refurbishment of the core areas and creating a protected communal area stair core with access control on each floor.
Prepared design drawings and specification and obtained competitive tenders via traditional tender procedure.
Prepared JCT Intermediate Contract with Contractors Design Undertook the roles of project manager, contract administrator, cost consultant and principal designer.